Build industrial warehouses for Sidcup Logistc Park in Dartford
Our latest project was to do an office fit out in two newly
build industrial warehouses.
We build a 60 min fire rated jumbo wall, which was built on top of a mezzanine floor to create an office area separated from warehouse, the work also included wall linings, taping and jointing, window boards and
suspended grid ceilings.
Inside the warehouse we built an accessible toilet with a 30 min fire rated door and frame.